ORANGE COAST COLLEGE KINESIOLOGY AND AQUATICS CENTER

  • Client
    Coast Comm. College District / CW Driver
  • Location
    Costa Mesa, CA
  • Size
    113,000 sq.ft.
  • Year Completed
    2020

Designed by Little Architecture & Design and constructed by CW Driver, this project with an estimated cost of $32 million was completed in 2020. It houses one competition-sized pool, another pool for physical education, and several coaching offices. The facility consists of a site of approximately 113,000 sf, with 37,650 ground square feet of conditioned program, a 9,250 ground square foot shade canopy, a 65 meter competition pool, and a 25 yard instructional pool. The project was a collaborative effort between OCC’s Kinesiology and Athletics Division, and the Little Project Team.